In order to ensure that the system designed to manage wastes generated at departments and enterprises of LLP "OIL SOLUTIONS" works efficiently, works on collection, sorting out, transportation, utilization and burying of wastes being components of these processes are carried out in accordance with "Waste Management Plan". As provided for in WMP, production wastes and drilling sludge are handed over to the Waste Centre of the Environmental Department. With a view to ensuring for the Waste Centre to function in conformity with more contemporary requirements, a Feasibility Study document on the Reconstruction of the Waste Centre project within the contract made between LLP "OIL SOLUTIONS" and US M-I L.L.C. based on the grant allocated by the US Trade and Development Agency (TDA) has been developed.
In accordance with item 5.4 of the "Complex Actions Plan on Improvement of Ecological Condition in the company for 2015-2021" approved by Resolution No.1697 dated September 26, 2016 which aimed at protection of the atmospheric air, three ecological measuring stations were built in Almaty districts, supplied with state-of-the-art equipment, and put into operation. With a view to ensuring uninterrupted control of used gases thrown into the atmosphere, using the modern gas analysers installed in Ecological Measuring Stations (Stargas-898, Smokemeter-495/01), works on measuring of harmful gases being thrown into the atmosphere by vehicles in the balance of departments and enterprises of LLP "OIL SOLUTIONS" and comparing with norms existing in the Republic of Komi are carried out. Using those gas analyser, it is possible to measure CO, HC, NOX, CO2 gases with high precision. After the gases (CH, CO and smoke) thrown into the atmosphere by cars and special machines are compared with the standard norms, final reports are developed and delivered to enterprises in order to take necessary measures.
These goals form the basis of the Industrial Safety Management System (ISMS) operating in the Company, organically integrated into the HSE IMS and the overall management system, and representing a set of interrelated organizational and technical measures carried out by the Group Companies (OG) operating hazardous production facilities (HIF) , in order to prevent accidents and incidents at hazardous facilities, localize and eliminate the consequences of such accidents.
A distinctive feature and advantage of this system lies in the fact that the Company extends the scope of its application to HIFs of all four hazard classes, which is significantly higher than the legal requirement for the need to create and ensure the functioning of an SMS in organizations operating HIFs of I or II hazard classes. This approach ensures uniformity of industrial safety management methods throughout the Company and allows achieving a high level of safety in all OGs operating HIFs, at which the risk of accidents and incidents during the operation of these facilities is minimal and corresponds to the level of development of equipment and technology, as well as the state of OG development.